1. Destpêk
This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.
2. Hilbera Serîview
The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

Wêne 1: Serview of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.
2.1. Kit Components
- 2x 12V 1.2Ah Sealed Lead-Acid Batteries
- Smart Charger Board
- Têlên têl
- Battery Holder/Mounting Base
- Mounting Brackets
- Fasteners (screws, keys)
- Destûra Rêvekirinê (ev belge)

Wêne 2: Berfireh view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.
3. Compatibility
This battery backup system is compatible with the following BFT gate operator series:
- Deimos BT series of slide gate operators
- VIRGO - LINX
- EOS-SCE
- HYDRA N
- DEIMOS BT-QSC D-NETTUNO S
- SB BAT/SB CARBAT (DEIMOS BT-SB 300)
- BT BAT 2 (URANO BT ARES 1000 & ARES 1500)
- NETTUNO B
- VENERE D
- ARGO
- LIBRA C MA - LIBRA C LX
Ensure your gate operator model is listed above for proper functionality.
4. Sazkirin û Sazkirin
Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.
4.1. Tedbîrên Ewlekariyê
- Hêzê qut bikin: Always turn off the main power supply to the gate operator before installation or maintenance.
- Amûrên Maqûl: Use appropriate tools for electrical connections and mounting.
- Têlkirin: Piştrast bike ku hemî girêdanên têlan ewle ne û bi rastî polarîze bûne.
- Dor: Install the kit in a dry, protected location, away from direct weather exposure.
4.2. Gavên Sazkirinê (Rêbernameyên Giştî)
- Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
- Pîl têxin: Place the two 12V 1.2Ah batteries into the battery holder.
- Batteries Girêdan: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
- Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
- Têlkirina Ewle: Route and secure all wiring to prevent pinching or damage.
- Vejandina Hêzê: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
- Pergala Testê: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.
5. Telîmatên Operating
The BFT SB-BAT P125002 operates automatically once installed correctly.
5.1. Normal Operation (Power On)
When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.
5.2. Power Outage Operation (Power Off)
Di bûyera hêzek outage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.
6. Maintenance
Regular maintenance ensures the longevity and reliability of your battery backup system.
6.1. Battery Recharging
Piştî hêzek outage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12 heta 14 saetan. It is important to allow sufficient time for batteries to fully recharge after use.
6.2. Fuse Check
Sîstem dihewîne a 20A sîgorte for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.
6.3. Jîyana Pîlê û Guhertin
Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).
7. Destpêkirin
If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:
- No Power During Outage:
- Piştrast bikin ku hemî girêdanên kabloyan rast û ewle ne.
- Check the 20A fuse.
- Ensure batteries are fully charged. If recently discharged, allow 12-14 hours for recharging.
- Battery test voltage. If below 20.4V (exhausted battery protection threshold), batteries may need replacement.
- Pîl nayê barkirin:
- Confirm main power supply to the gate operator is active.
- Check all connections to the smart charger board.
- Inspect the 20A fuse.
- Reduced Operation Time:
- Batteries may be aging and losing capacity. Consider replacement.
- Ensure batteries are fully charged before testing.
For persistent issues, contact BFT technical support or a qualified service technician.
8. Specifications
| Taybetî | Specification |
|---|---|
| Hejmara Model | P125002 |
| Cureyê Pîl | Lead-Acida morkirî |
| Kapasîteya Pîl | 2x (12V 1.2Ah) |
| Output Voltage | 24V DC (navînî) |
| Charge Voltage | 27.2V |
| Charge Current | 130mA |
| Dema Recharging Pîlê | 12-14 saetan |
| Exhausted Battery Protection Threshold | 20.4V |
| Nirxandina fuzeyê | 20A |
| Germahiya xebitandinê | Data detected with external temperature of: 25°C (77°F) |
9. Garantî û Piştgirî
For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.
BFT Contact Information: Please visit the official BFT webmalper ji bo agahdariya têkiliyê ya herî nûjen û çavkaniyên piştgiriyê.